Tuesday, March 12, 2013

March 12 2013

The dirt moving is over for now and the loader has been returned. The area by the containers is now compacted and bulldozed. I'm surprised by how much more flat area we have now. I will now proceed to cut the top of the bunker down (it's 3.6ft above required grade) and convert it into a valve room. After this I can trench from the sand filter and run all the geothermal lines to the valve room as a terminus and then manifold them into the 2" pipe that will run to the guest house and the heat pump.
Once this has been completed I can then finish the sand filter and install the distribution box and septic tanks.
It snowed in the local mountains this weekend (Santa Suzannas) but we were in the 70's.







This black and white was taken by my brother:





No comments:

Post a Comment