June 26 2013
The I beams are all in. Now for some formwork , galvanised roofing (verco w2) and some concrete.
Wednesday, June 26, 2013
Thursday, June 20, 2013
Saturday, June 8, 2013
Monday, May 20, 2013
May 20 2013
I've notched the "bunker" for the I beams using a hydraulic concrete saw powered by my trusty Unimog. The I beams are being worked on also with the final cutting to size after I've installed the 1" concrete bolts. Slowly but surely...
The weather is a balmy 72 degrees with an awesome cooling ocean breeze.
I've notched the "bunker" for the I beams using a hydraulic concrete saw powered by my trusty Unimog. The I beams are being worked on also with the final cutting to size after I've installed the 1" concrete bolts. Slowly but surely...
The weather is a balmy 72 degrees with an awesome cooling ocean breeze.